May 31
2015
|
Knitting AlongPosted by Peanut in Knitting , Knit-a-long |
About a month ago I joined a linen themed knit-a-long on Ravelry. It seemed like the perfect opportunity to make some progress on one of my works-in-progress. I really wanted to wear my Emma shrug this summer and a knit-a-long deadline was just the thing to push me to get it finished. Even with the deadline looming it’s been slow going though. The linen is tough to work with. I love the fabric it is making but it’s slippery and inelastic and my hands get sore after about a pattern repeat. I also seem to have a bit of trouble remembering to follow the pattern correctly. I don’t think I’ve ever gone backwards so much on one project. I’ll be knitting along and realize I missed on the yarn overs on the previous row or made all the decreases the wrong direction and have to tink back and redo it. Even two-steps-forward-one-step-back progress is still progress though and I’m a little over half way across my shrug. I’ve got 8 days until the deadline and 8.5 repeats left to go. I think if I keep at it I can finish on time (and nothing bad is going to happen if I’m a day or two late).